Tested and Proven
TÜV Rheinland LGA Bautechnik GmbH rigorously tested and approved the Underbold-POD30
roading system developed by GGT-German-GreenTec Ecologic GmbH, by conducting comprehensive evaluations of its performance in
real-world conditions. The testing process included assessing the additive's
effectiveness in enhancing soil adhesion, durability under various environmental
conditions, and overall contribution to road stability. Their expert analysis
confirmed that the Underbold-POD30 system meets stringent safety and quality standards,
ensuring reliable and long-lasting road foundations. This certification underscores
the system's suitability for modern infrastructure projects, reflecting TÜV
Rheinland's commitment to excellence in construction quality assurance.
Underbold-POD30
PresentationIndependent
Tests
Process
Underbold-POD30® is a liquid additive developed for the faster, easier and more affordable
construction of road foundations.
When constructing a new road, parking lot or
driveway; Underbold® is mixed in with the existing soil making the soil particles
more adhesive to the bonding agent. The bonding agent is then mixed into the soil
and settles around and between the particles treated with the Underbold® mixture.
Transformation
✔ Up to 30% cost savings
✔ No
need for filling materials such as crushed stones and gravel
✔No long
journeys bringing in bituminous materials
✔Projects take a shorter time
to complete
✔The completed surface is more durable
Multiple Advantages
- Time: Considerable time savings due to shorter construction
time of the overall project.
- Cost: Significant cost savings due to faster and more efficient
construction. Less material and machine use.
- Durability: Increase in load-bearing capacity + Increase in
modulus of stiffness + Increase in elasticity + Complete frost resistance.
- Environmental: 100% natural ingredients. Less exhaust emissions
due to less material movement. Reduction of CO2.
Workflow
- Preparation: (1) Leveling of the surface, removal of the
organic top layer, preliminary profiling.
- Tamper: (2) Mixing in the emulsion. Crushing and mixing the
soil with the Underbold POD30 water mixture.
Preliminary profiling.
- Application: (3) Distribution of the binder on the surface.
- Mixing: (4) Mixing the soil with the binder.
- Profiling: (5) Final profiling of the desired slope.
- Compaction: (6) Maximum compaction of the mixture.